Commercial Structural Engineer in Kempsey
Industrial Loads Ask Different Questions

Where Commercial and Industrial Work Concentrates
Four areas make up most of the commercial and industrial work we take on.
- 01
Warehouses, factories and workshops. Portal frames, roof bracing and slab design have to account for the equipment and vehicle traffic a building will hold, not just the shell itself. We size the frame around the operation rather than the floor area.
- 02
Mezzanine floors and plant platforms. A mezzanine adds load to a slab and a frame that may not have anticipated it, so both the new structure and the existing one need checking. Plant platforms bring the added issue of vibration and dynamic load from the equipment they support.
- 03
Office fit-outs and structural alterations. Removing a wall, cutting a penetration through a slab or forming a service opening all change how load moves through a building. We identify what's carrying load before anything gets cut, then design the transfer structure needed to replace it.
- 04
Structural upgrades and industrial assessments. Older industrial buildings are often asked to do more than they were designed for, whether that's heavier racking, a new crane rail or a change of use. An assessment establishes the existing capacity first, which sets a realistic scope for any upgrade.
The mezzanine's own framing is only part of it, because the load has to travel down through the columns into the existing slab and footings beneath. In many buildings the slab turns out to be the governing element rather than the steelwork above it.
A building designed for light storage may be asked to hold racking, machinery or vehicle traffic under a new occupant, and those loads can exceed the original design assumptions. An assessment establishes the existing capacity so any upgrade is scoped against real numbers.
Strengthening usually targets specific elements rather than the whole frame, commonly adding steel to overstressed members, stiffening connections or thickening a slab in loaded areas. The assessment comes first, because it identifies which elements actually govern capacity.
